A plan, not a pitch. No price today.
Did we get that right?
Your goal, modelled on your own example.
How many of the 16,000 come from accounts you do not have today?
Two forum threads, in their words. Each one maps to a product you already sell.
Most common scope gaps you see and how you've reconciled them.
"Foundation contractor and carpenter both claiming they don't have structural fasteners/anchor bolts included, with neither excluding them. [...] Plumber and HVAC both pointing at each other."
Comment, 47 upvotes: "nearly 1 million a year in one region alone for bad precon math on those items alone."
The gap sits between trades at buyout. Your trade-by-trade scope sheet is the fix.
How much time do you actually spend creating Submittal Logs?
"My first project 50M took 50hr. (1250 spec pages) We use now Procore to auto create submittal requirements, that being said it is only 50% accurate."
Another thread, 72 upvotes: "$40,000 in extra material ordered wrong" if nobody had read the spec.
The pain is hours per job. The doubt is whether software gets it right.
Meta ads running 30+ days, the ones that are likely profitable.
Faster, Smarter Takeoffs Start HereTakeoffs made easy. Get 80% faster estimates with AI-powered software designed for construction teams.
Hook: speed. Offer: learn more, book a demo.
Try Bluebeam Max Free"Humans make mistakes, but with Bluebeam Max, AI can find mistakes before they cost you."
Hook: mistakes before they cost you. Offer: free trial.
Get your FREE demo today.
Hook: easier construction. Offer: free demo.
A recorded panel, forums and verified reviews. With your won-deal recordings, we do the same on your calls.
"AI finds like 12 scope gaps, and maybe 11 of those are actually real. So, an estimator still needs to decide."
Construction tech panel, recorded
Pitch it as a draft your PM signs off, not a robot.
"We also already have Autodesk's 'AI' software that is supposed to do this. It doesn't work great."
r/ConstructionManagers, on submittal logs
They own a tool already. Offer to check it against theirs.
"[...] finding relevant information within the specification book and intelligently linking it to the corresponding drawing details."
G2 reviewer, mid-market contractor
Say spec book and drawings, not AI.
"The biggest hurdle is the initial learning curve. [...]"
G2 reviewer, mid-market contractor
First test: they send files, we send results. No setup.
Line 1: their dream outcome as a question. Line 2: how, or the pain it removes.
Precon director
Wants: no scope surprises after award
Built from: the scope gap thread
Hi [first name], if we could help you buy out your next job with no scope surprises after award, would that help?
Without your team reading every sheet.
Nick
Project manager
Wants: material right and on site on time
Built from: the submittal threads
Hi [first name], if we could get your submittals approved the first time, so material shows up right and on time, would that help?
Without anyone reading 1,200 spec pages line by line.
Nick
VP of operations
Wants: jobs finish at the margin they were bid at
Built from: the $1M a year bad precon math comment
Hi [first name], if we could help your jobs finish at the margin you bid them at, would that help?
By catching the scope no sub covered before buyout, not after.
Nick
Owner or CEO
Wants: more work, same team
Built from: your 70% PM time claim
Hi [first name], if your PMs could run more jobs each without working later, would that help?
Without hiring another PM.
Nick
These are 4 of the 10 angles. Test 2 adds a free scope check on one live job to whichever wins. Each goes to 1,000 people before we call it.
Is that what each of them really wants?
| Month 1 | Month 2 | Month 3 | After |
|---|---|---|---|
| 10 angles, side by side | Rotate: everyone gets a new pain | Rotate again, winners get more volume | Winners keep running, losers get replaced |
Which pain would you bet on? We'll see if the market agrees.
That is why outbound spend felt unrelated to ROI. Nobody owned the steps before the call.
Where do you disagree?
How we get there: score before we send, name one painful moment in the email, give something real (the free scope check) so they show up with a live job, and count only what your team calls qualified.
What would make you say "hell yes" about an opportunity?
Does Day 30 to 45 for the first opportunities fit your January hiring?
Every reply is market research you would pay for anyway.
Who on your team would use this first?
| Company | Role (name withheld) | City |
|---|---|---|
| Skiles Group | Director of Preconstruction | Frisco, TX |
| PATIN Construction | VP of Preconstruction | Austin, TX |
| Chasse Building Team | Chief Estimator | Phoenix, AZ |
| ASR Construction Group | Preconstruction Manager | Phoenix, AZ |
| University Mechanical | Chief Estimator | Mesa, AZ |
| Kovach, Inc. | Preconstruction Manager | Gilbert, AZ |
A sample from your new territory. Same approach across the whole US.
Is this who you want in the room?
Anonymized
A contractor asks for a demo. The client's sales team: "SQO. Meeting was held today."
What would you need to see to trust this would work for you?
Who on your team owns this?
Next: we bring the plan with terms.